Home › Services
Listed repair-first, because that is the order the verdict goes in. The replacement pages are for when the table says so.
Tracing the water up the slope from the stain to the entry point, and ruling out the attic air handler on the way.
Punctures, bruised shingles, bent drip edge and the gutter that went with it. The most Spring-specific job on the list.
Where two slopes meet, where a wall meets a roof, and where a 1990s skylight curb has given up.
Cutting out the rotted bottom laps on a shaded gable, and the fascia behind an overflowing gutter.
Sagging hangers, separated seams and gutters full to the brim with needles, put right before the fascia pays for it.
Second and third roofs: decking on 1970s houses, overlays, and the ventilation that gets fixed while the deck is open.
What a laminated shingle does under a canopy that a three-tab did not, and how to read a wind rating.
Replacing a whole elevation of 1970s to 1990s hardboard, usually the rear or a side, while the front brick stays.
The usual replacement product, and the installation details under trees that decide how long it lasts.
New gutters sized for needles, and downspouts that put roof water somewhere other than the clay at the slab edge.
That is the normal state of things. Call and describe the roof; the verdict comes first, the service second.
Call (832) 447-6614 Ask for a Verdict